無論是身處學(xué)校還是步入社會,大家都嘗試過寫作吧,,借助寫作也可以提高我們的語言組織能力,。那么我們該如何寫一篇較為完美的范文呢?下面我給大家整理了一些優(yōu)秀范文,希望能夠幫助到大家,,我們一起來看一看吧,。
cet6閱讀真題篇一
where there is life, there is hope.以下是小編為大家搜索整理的大學(xué)英語cet6閱讀練習(xí)題壓軸預(yù)測,希望能給大家?guī)韼椭?更多精彩內(nèi)容請及時(shí)關(guān)注我們應(yīng)屆畢業(yè)生考試網(wǎng)!
in the last two hundred years there have been great changes in the method of production of goods. this is now also true of the building industry; for mechanization has been introduced. system building can save both time and money. the principle of system building is that the building is made from a set of standard units. these are either made at the building-site or at a factory. some designers, in fact, are standardizing the dimensions of rooms. they are made in multiples of a single fixed length, usually ten centimeters. this is called a modular (標(biāo)準(zhǔn)件的) system, and it means that manufactures can produce standardized fittings at a lower cost. the most important fact about system building is its speed. a ten-storey flat, for example, can be completed in four months.
there are several new methods of system building. one is the panel method. in this case, the construction company sometimes erects a factory on the site. the walls and floors of the building, called panels, are cast in a horizontal or vertical position. conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. the moulds for making these castings are situated all around the building.
after the concrete panels are cast, they are allowed to set and harden for a week. next they are lifted by a tower crane on to any section of the building. there the panels are cemented together at their joints and the floor covering is laid.
after the panels have been cemented together, the crane lifts a case into the area. it contains all the fittings to be installed, such as wash-basins, radiators and pipes. finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
in some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. a giant overhead crane is used to lift them into position. in the future, this method may become more widespread.
1. the main difference between panel method and the method discussed in the last paragraph is_______.
a. the latter uses ready-made internal features
b. panels are cast in a level position
c. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
d. the former is more expensive than the latter
2. which of these statements is true of system building?
a. it employs more men. b. it is difficult and dangerous.
c. it can save both time and money. d. it means less mechanization.
3. according to the passage, the principle of system building is that_______.
a. construction methods are safer
b. buildings are made from a set of standardized units
c. similar buildings can be produced
d. all units are produced on the site
4. the usual fixed length in the modular system is_______.
a. twenty centimeters b. ten millimeters
c. fifty centimeters d. ten centimeters
5. what lifts the concrete panels onto the building?
a. cranes. b. man-power.
c. pulleys. d. hydraulic jacks.
s("content_relate");
【大學(xué)英語cet6閱讀練習(xí)題壓軸預(yù)測】相關(guān)文章:
全國英語cet6聽力題型壓軸預(yù)測
08-24
商務(wù)英語bec中級閱讀壓軸預(yù)測
06-19
大學(xué)英語六級cet閱讀試題壓軸預(yù)測
06-17
最新雅思英語考試閱讀壓軸預(yù)測
08-24
最新大學(xué)cet6閱讀理解完型填空壓軸訓(xùn)練
08-25
大學(xué)生英語cet6閱讀基礎(chǔ)練習(xí)題
08-25
大學(xué)英語cet6閱讀材料
06-03
大學(xué)英語六級考試閱讀壓軸預(yù)測試題
08-19
2017年托福閱讀考試壓軸預(yù)測
08-20